CLIENT: Pope & Talbot, Inc.
LOCATION: Halsey, Oregon
This project consisted of a complete new recausticizing system to replace an existing system. New equipment included a new white liquor pressure disc filter, slaker, causticizers (4), lime storage tanks, green liquor stabilization tank, and a new MCC building. The process converts approximately 600 gpm of green liquor into white liquor.
The owner acted as general contractor and the project was completed in a 16-month time frame.
Engineering Services Provided on This Project:
Site Development
- Site preparation
- Drainage
- Paving
Foundation Design
Structural Design
- Controls and Instrumentation
- (DCS)
Electrical Design
Mechanical
- Hot lime conveyor
- MCC room HVAC
Piping
Field engineering, construction management, and start-up assistance
Provided fast track engineering, including all mechanical, civil, structural, electrical, and control design (PLC).
Wrote technical specifications for all purchased equipment, fabrication, and installation services.
Provided construction and start-up assistance.

|